

Fengfan pipe industry adheres to market-oriented, innovation as the core, actively digests and absorbs advanced technological achievements at home and abroad, focuses on independent research and development, and is committed to the research and development, production and sales of new plastic pipes and high-end electrical products to meet the needs of users. The pursuit of quality life always care for the safety of drinking water, and give you a healthy life with heart.
Advantages
1. Pure raw material, hygienic and environmentally friendly polyethylene raw material. It is non-toxic, tasteless, and does not breed bacteria. It has been recognized for its hygienic properties, corrosion resistance, and is widely used in drinking water supply pipelines.
2, Convenient installation, large water flow, convenient and reliable hot-melt connection, easy construction and maintenance, smooth inner wall, low fluid resistance, and more suitable for water supply and drainage projects with excellent softness, not restricted by terrain conditions, light weight, and easy to transport.
3. Low cost, long service life, excellent quality, economical price, safe investment and long service life.
4. Strictly check the high standards and pass the "self-inspection, mutual inspection, and special inspection" level by level inspection to strictly control the quality. Perfect quality assurance system, advanced testing methods, strict testing system
Information
| Item | PPR Over Bridge |
| Material | PPR |
| Diameter | Φ20-Φ32 |
| Color | Green,White,Grey or as Request |
| Origin | Zhuji,Zhejiang,China |
| Brand | Ifan |
| Package | opp bag |
| OEM&ODM | Accept |
| Certificate: | ISO,SGS CE |
PPR Over Bridge installation steps
1. Planning. Before installation, make a simple design and plan for the layout of the water pipes. Where water is needed, what is the height of the faucet, what is the direct distance between hot and cold water, and the layout of various water equipment must be advanced. Make a mark and leave the design drawing at the bottom for later maintenance.
2. Slotting. No matter whether the water pipe is on the ground or on the roof, it needs to be slotted. When slotting, pay attention to the distance between the hot and cold water pipes and the distance between the hot and cold water pipes. Also, the depth of the slotting should be higher than that of the pipe. diameter.
3. Connecting pipes. The connecting pipes are usually hot melted. Pay attention to the technique and time control during operation to prevent the hot melt of the water pipe from being in place or deforming.
4. The water pipes mentioned above cannot be crossed directly. They must be connected by a PPR Over Bridge. The distance between some outlet joints must be grasped, especially for shower faucets. The distance between the two sides must be 15 cm. The height of the sink and washbasin is about 45 cm, the most reasonable.
5. Fixed. Test the pressure. After the water pipe layout is installed, the water pipe must be fixed with a special buckle. The distance between the buckles cannot exceed 80 cm. After the regulation is set, the pressure test of the water pipe must be carried out. The test time must be more than half an hour. Check each interface and Whether the valve is leaking.
our service:
Online and offline double protection. Offline is a strong support online, professional operation team, 7*16 hours customer service online, to solve your problems
Full track professional services. We adhere to the "customer service one-to-one full tracking service" system, from the moment you place an order until the receipt of the goods, our professional customer service will provide one-to-one full tracking service.
Hot Tags: ppr over bridge, China, suppliers, manufacturers, factory, customized, bulk, pricelist, for sale, free sample, made in China, PPR Plastic Reducing Socket, PPR Equal 90 Elbow, HDPE Pipe, PPR Plastic Reducing Tee, PPR Brass Male Tee, PPR Fitting
Send Inquiry





