What should be mastered for heating and debugging of floor heating system?

Sep 04, 2021

What are the main points to be mastered for the heating and debugging of the floor heating system? How to debug?

Answer: System heating and debugging is an important link to ensure and further evaluate and inspect the quality of engineering design and construction, and it must be carried out carefully. During the trial operation, the temperature of the first heating water should be strictly controlled, and the heating process must be kept stable and slow to ensure that the building components have a gradual adaptation process to the temperature rise.

During the initial heating, the temperature of the hot water for debugging should be gentle, and the temperature of the water supply should be controlled at this time, the ambient temperature should be about 10°C higher, and should not be higher than 32°C, and it should be operated continuously for 48 hours, and the water temperature should increase every 24 hours thereafter by 3 ℃ until reaching the design water supply temperature. At this temperature, the heating pipes connected to each group of water tanks and water collectors should be adjusted one by one until the design requirements are met.


Send Inquiry